The Bandra-Worli Sea Link is actually named Rajiv Gandhi Sea Link and is built over the Arabian Sea. Construction of the sea link was started in 2000 and was completed only in 2010. The bridge ...
The BMC statement said that the bridge was built using the 'Bo Arch String ... which runs from Shamal Das Gandhi Marg to the Worli-Bandra Sea Link, is almost 94% finished. According to the ...
Hosted on MSN2mon
Maharashtra CM and Dy CM Shinde inaugurate North Channel Bridge linking Coastal Road Project to Worli-Bandra Sea Link"A 70-hectare park will be built here. The file for 120 acres of land of Mahalaxmi Race Course has been opened, the agreement has been done... The special thing is that a 300-acre world-class ...
After a lot of anticipation finally, Mumbai Coastal Road Project and Bandra-Worli Sea Link got connected successfully. Earlier, the Brihanmumbai Municipal Corporation (BMC) allocated Rs 3200 crore ...
A toll booth supervisor was injured after being hit and dragged by a cab that evaded toll payment on the Bandra Worli Sea Link. The driver fled the scene, and police are working to locate him ...
Mumbai: Nearly a month after the southbound bridge connecting Bandra-Worli Sea Link and Mumbai Coastal Road was opened for motorists, around 4,000 more vehicles are now using the high-speed ...
The incident took place on Monday, when the driver (licence plate MH 02 GH 0896) was heading towards Worli. The supervisor tried to stop the vehicle as the driver did not pay the toll, but the ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results